Who's reading our blog?

Friday, January 21, 2011

Kids bathroom demo

Here are a couple more pics of the demolition process going on at the farm.  These are what will be the kids' bathrooms:
This is Caleb's room (the Bulge).  He will
lose the door just to the left of the radiator, and
a new door will go in where the radiator is located. 
That will be an entry into a 1/2 bath for him.

This is (was) the bathroom between the Bulge
and the Nursery.  It will be replaced by two 1/2 baths
and one shower room that the kids will share.


This is the old bathroom (Nursery to
the right through the door).  There was
a built-in closet straight ahead which was
removed to make room for Eliza's 1/2 bath.


The new doorway leading out of the kitchen -
it's been widened (looking at temporary
wall and door which will be open to family room).


1 comment:

  1. WOW - You are moving very FAST! Interesting to see what they took out of the bathroom - I definitely need to come up again soon before going south! Mouse

    ReplyDelete