The old soapstone sink is now fixed in place. Note the new plumbing to the right. Matching cabinet doors will be made to go below it. |
The new kitchen island is now framed in. It will be 11' long and will have bookcases on either end. |
Welders installing steel support beams in the kitchen walls... |
A steel beam up close... |
A steel beam from the inside of the kitchen...it's the maroon-colored material on the ceiling and running like a post in the wall... |
This sketch shows the new bay above the kitchen and may help explain why the structural engineer required the steel beams. |
This is Caleb's room -- the door to the left is a closet, but the original door to the bathroom has been removed. |
Now Caleb's door to the bathroom will be straight ahead where the radiator was formerly located. The former door will be a wall; and he'll have bookshelves on the wall by the window. |
No comments:
Post a Comment